Cogeneration Plant – Tersa d.o.o. Črnkovci
Completed

Cogeneration Plant – Tersa d.o.o. Črnkovci

Project period: 11/01/2017 – 31/12/2020

Beneficiary

The project achieves annual thermal energy savings of more than 7 MWh. The cogeneration plant will also generate electricity that was previously purchased from the public power grid, producing approximately 2.6 MWh of electricity from renewable energy sources each year. In addition, the project will reduce CO₂ emissions by 721 tonnes annually.

Project value

20.085.626,20 HRK

Amount co-financed by the EU

13.921.121,25 HRK

Project duration

Start: 11/01/2017

End: 31/12/2020

Project

Short project description

This project was co-financed by the European Union through the European Regional Development Fund.
For more information about the European Structural and Investment Funds, please visit:
http://www.strukturnifondovi.hr/

For more information about the Operational Programme Competitiveness and Cohesion 2014–2020, please visit:
https://strukturnifondovi.hr/eu-fondovi/esi-fondovi-2014-2020/op-konkurentnost-i-kohezija/

Information

Contact persons for more information

Vlado Šakić, tersa@tersa.hr, director

Additional

Additional information

The project includes the reconstruction and extension of the existing production hall to accommodate a cogeneration plant with a planned capacity of 400 kW of electrical power and 615 kW of thermal power.