The project includes the reconstruction and extension of the existing production hall to accommodate a cogeneration plant with a planned capacity of 400 kW of electrical power and 615 kW of thermal power.
Cogeneration Plant – Tersa d.o.o. Črnkovci
Project period: 11/01/2017 – 31/12/2020
Beneficiary
The project achieves annual thermal energy savings of more than 7 MWh. The cogeneration plant will also generate electricity that was previously purchased from the public power grid, producing approximately 2.6 MWh of electricity from renewable energy sources each year. In addition, the project will reduce CO₂ emissions by 721 tonnes annually.
Project value
20.085.626,20 HRK
Amount co-financed by the EU
13.921.121,25 HRK
Project duration
Start: 11/01/2017
End: 31/12/2020
Short project description
This project was co-financed by the European Union through the European Regional Development Fund.
For more information about the European Structural and Investment Funds, please visit:
http://www.strukturnifondovi.hr/
For more information about the Operational Programme Competitiveness and Cohesion 2014–2020, please visit:
https://strukturnifondovi.hr/eu-fondovi/esi-fondovi-2014-2020/op-konkurentnost-i-kohezija/
Contact persons for more information
Vlado Šakić, tersa@tersa.hr, director